Skip to main content

5.6 Inclusive quality, equality and accessibility (I.3)

Content
Paragraphs
Title
5.6.1 Description and assessment
Text

To promote neighbourhood equality, it is crucial for projects providing housing and services to ensure that they contribute to improving residents' quality of life. This KPI assesses the extent to which the project ensures that the quality of created spaces and services is maintained over time, the distribution of services and their accessibility is equitable, and the production of spatial disparities is limited as much as possible through the choice of housing models that promote diversity and inclusion.

In the case of housing projects, the target of inclusive quality, quality and accessibility aims to enhance inclusiveness and meet the needs of the most disadvantaged families by promoting, on one hand, housing that adapts to the spatial needs of households based on their composition and, on the other hand, by encouraging renting as a preferred form of tenure. Both conditions, inadequate dwelling space for households and shortage of rental options, tend to affect low-income households more than others and produce socio-spatial inequalities.

Ensuring access to services and livelihood opportunities is crucial for inclusiveness (FMI, 2020b). Offering services and spaces that rapidly deteriorate in quality not only hinders but also undermines equality in the long term. For example, the lack of maintenance can be observed in the degradation of common or public spaces, more often in deprived neighbourhoods. This may lead to a reduction in the quality of life related to public health issues or an increase in conflicts among neighbours and must be avoided by NEB projects.

Finally, proximity of basic services and walkability at the neighbourhood scale have become a shared goal at the international level (UN-Habitat, 2023). Both services and walkability are regarded as essential for promoting equitable access to existing resources and opportunities, particularly for individuals living in deprived neighbourhoods who are most affected by the lack of access to basic services and amenities. In this context, a project should be assessed against whether it ensures an adequate walking distance from basic and fundamental services and amenities and from public transport. In addition, as a part of the NEB method the quality of services (such as transportation frequency or the presence of comfortable sidewalks) should be assessed. It is important for designers and project managers to be aware that these aspects must also be part of the design strategy.

While this approach adheres to the well-known principles of the 15-Minute City — which claims for a spatial distribution capable of making every resource within an easy reach (C40 Cities and ARUP, 2021) — it is also important to emphasise that, on its own, such an approach cannot be the solution to the fair redistribution issue. In fact, the 15-Minute City must be contextualised within the area of implementation, especially to avoid reinforcing segregation processes (Marchigiani and Bonfantini, 2022). This requires a deep understanding of the context rather than the application of predetermined models.

Under the KPI Inclusive quality, equality and accessibility (I.3), an assessment of the following indicators is performed:

  • Available dwelling space for households (I.3.1).
  • Maintaining the quality of spaces and services (I.3.2).
  • Rental scheme (I.3.3).
  • Homeownership scheme (I.3.4).
  • Pedestrian accessibility to essential services and amenities (I.3.5).
  • Accessibility to services and amenities by public transport (I.3.6).
  • Pedestrian accessibility to public transport (I.3.7).

The total score of the KPI I.3 for Inclusive quality, equality and accessibility is calculated in the following way:

In the general case, when all indicators are considered, I.3 score is evaluated according to Equation (226).

(226)

aa

Five indicators (i.e. I.3.1, I.3.3, I.3.4, I.3.5, I.3.6) out of the seven that form the key performance indicator I.3 apply only to residential projects. These indicators will therefore be excluded from the calculation of the I.3 score for non-residential projects. Accordingly, in the case of non-residential projects, I.3 score is evaluated according to Equation (227).

a

(227)

a

Indicators I.3.3 and I.3.4 apply only to residential projects that involve rental and homeownership tenure, respectively. Projects that offer both forms of tenure must include both indicators in the evaluation of I.3, according to Equation (226). Projects that offer either rental or homeownership must include in the calculation only the indicator corresponding to the provided tenure and omit the other one, according to Equations (228) or (229), respectively

a

(228)

a

(229)

Each indicator is evaluated with a score between 0-100. The performance class of the I.3 key performance indicator is assessed according to the thresholds in Figure 112.

Figure 112. I.3 performance classes and thresholds.

a

Source: JRC.

Title
5.6.2 Available dwelling space for households (I.3.1)
Text

Indicator I.3.1 applies only to residential projects.

The dwelling space available to a household, depending on the specific needs related to its composition, is crucial to ensure housing quality and health, wellbeing, and important outcomes such as children's and teenagers’ education (OECD, 2021). Lack of intimacy, excess of stimulations and interactions is a source of stress and is found to have negative impacts on children’s school performances and mental health (von Simson and Umblijs, 2021).

A household is considered overcrowded if it does not have at its disposal a minimum number of rooms equal to one room ([1]):

  • for the household;
  • for each couple in the household;
  • for each single person aged 18 or more;
  • for each pair of people of the same gender between 12 and 17;
  • for each single person between 12 and 17 not included in the previous category;
  • and for each pair of children under age 12.

Each room must provide the minimum size recommended by local standards with reference to its occupation.

Given this definition, the dwelling space of each housing unit must be assessed in relation to the household composition for which it was designed for. For example, if an apartment is designed and built for a household of four, according to the above-indicated criteria, it should be rent or sold to a relevant household composition.

If a building, neighbourhood or urban-scale project includes housing types with distinct attributes, e.g. housing units designed for different household compositions and/or different levels of space offered per household composition, the user may assess the most dominant housing type within the project. Alternatively, the user may perform multiple assessments corresponding to the distinct housing types. In the latter case, the indicator score is estimated as a weighted average, with the weights obtained from the relative occurrence of each housing type (in terms of number of housing units, area, or other features).

The assessment requires the following information to be identified and collected:

  • Project design plans.
  • Standards, guidelines and national standards relevant to minimum sizes per room.
  • Number of housing units.
  • Household composition for which each housing unit is designed. 

A project is rewarded when the housing units satisfy minimum space requirements associated with the composition of the household that was adopted in their design. 

The indicator is evaluated according to the question and the score provided in Table 161.

Table 161. I.3.1 score.

Metric: Does the housing unit satisfy minimum space requirements associated with the composition of the household that was adopted in the design? (single selection allowed)
1.The housing unit does not provide the minimum necessary space.
2.The housing unit provides the minimum necessary space.
3.The housing unit provides space above1 the recommended minimum.
Indicator score[1][2][3]
070100

1        This refers either to the availability of at least one room more than the minimum, or to at least 15% more space than the minimum, as prescribed by local regulations.

Source: JRC.

 

Figure 113 shows the indicator thresholds used to link indicator scores with performance classes for I.3.1. While these thresholds and performance classes are not directly applied in the evaluation of KPI and dimension scores and performance classes, they are included here to assist users in determining appropriate performance levels for specific project aspects and to offer clear guidance on their improvement.

Figure 113. I.3.1 indicative performance classes and thresholds.

a

Source: JRC.


[1]        https://ec.europa.eu/eurostat/statistics-explained/index.php?title=Glossary:Overcrowding_rate.

Title
5.6.3 Maintaining the quality of spaces and services (I.3.2)
Text

Preventing the deterioration in the quality of project spaces and offered services is crucial for ensuring long-lasting impact, especially if these outcomes might affect vulnerable or marginalised people. Some phenomena at the neighbourhood level (e.g. lack of clear separation and use between public and private spaces; littering and environmental crime; inappropriate waste management; inadequate maintenance of streets/lighting/signage/buildings) may have a negative impact on the population’s wellbeing and enjoyment of the place. While mechanisms of alarm and fixing are more appropriately set up at the neighbourhood level, similar monitoring of smaller places of inclusion can be implemented in a project to guarantee an adequate, fulfilling, and continually positive experience of place by its users. Monitoring further contributes to avoiding or mitigating disruptions, and timely intervening when they occur.

The goal of maintaining quality can be reached by defining a management strategy at the design phase of projects and allocating a budget for this purpose.

A strategy for the long-term maintenance of project outcomes and services must be designed through a partnership approach with all the relevant stakeholders, and it should include a monitoring plan, and an action plan.

At the building scale, plans should address the affordability of the offered services, energy savings, conflict resolution, the maintenance of common spaces where relevant, user satisfaction, safety issues, etc.

At the neighbourhood scale, plans should address the maintenance of common and public spaces, household solid waste management, safety issues, conflicts over uses in public spaces between different social groups, a monitoring system connected to higher decision-making levels, etc.

At the urban scale, plans must include at least a mapping of intervention areas organised by priority, a monitoring system aimed at identifying potential issues and organising quick responses, and coordination of the key stakeholders involved in maintenance and problem detection activities.

The indicator is evaluated according to the question and the score provided in Table 162.

Table 162. I.3.2 score.

Metric: Is a strategy1 in place for maintaining the quality of project spaces and services in the medium to long term? (single selection allowed)
1.A strategy is not included for the long-term maintenance of project spaces and services.
2.A strategy for the long-term maintenance of project spaces and services exists but it is limited to some aspects only (e.g. management of common spaces), with or without a budget.
3.A strategy for the long-term maintenance of project spaces and services is fully integrated into the project but no budget is allocated.
4.An overall strategy that includes a plan and an appropriate budget is allocated for the long-term maintenance of project spaces and services.
Indicator score[1][2][3][4]
05070100

1        Strategy is affected by scale according to Section 5.6.3.

Source: JRC.

 

Figure 114 shows the indicator thresholds used to link indicator scores with performance classes for I.3.2. While these thresholds and performance classes are not directly applied in the evaluation of KPI and dimension scores and performance classes, they are included here to assist users in determining appropriate performance levels for specific project aspects and to offer clear guidance on their improvement.

Figure 114. I.3.2 indicative performance classes and thresholds.

a

Source: JRC.

Title
5.6.4 Rental scheme (I.3.3)
Text

Indicator I.3.3 applies only to residential projects that adopt rental schemes. The rental sector refers to the part of the housing market where residential properties are made available for rent to tenants. A rental scheme refers to the structured programs or plans through which tenants may have access to rental housing (e.g. subsidised, private, social housing).

Access to the rental market, whether free or subsidised, should be encouraged over homeownership within a regulated and controlled system (see Section 5.7.2).

Where a project chooses, either wholly or partially, rental as form of tenure, it is important that the adopted scheme promotes an equitable distribution of rental options in the area, both free and subsidised, considering that affordable solutions are preferable to the free market as they promote access to housing for households in more disadvantaged conditions.

Projects need to be compared against the rental sector existing in context, to assess whether the choice of the rental scheme promotes equality. For example, in contexts where the share of private rental is dominant over other schemes, projects that promote forms of subsidised or social rental are rewarded with higher scores.  

The assessment of the indicator should consider the different types of rental schemes within a building, neighbourhood or urban scale project. The user may assess the most dominant rental scheme. Alternatively, the user may perform multiple assessments corresponding to the distinct rental schemes. In the latter case, the indicator score is estimated as a weighted average, with the weights obtained from the relative occurrence of each scheme.

The assessment requires the following information to be identified and collected:

  • Information about the local rental system (at the urban level).
  • The adopted rental scheme for the project.

The indicator is evaluated according to the question and the score provided in Table 163.

Table 163. I.3.3 score.

Contextual variance: How is the rental sector characterised at the urban level? (single selection allowed)
a.Dominant private market.
b.Moderate share of subsidised and social rental (>15% and < 25%).
c.Large share of subsidised and social rental (≥25%).
Metric: What is the rental scheme that is adopted by the project? (single selection allowed)
1.Private rental at market price.
2.Private rental at an affordable price (agreed rents).
3.Private rental with rent allowances.
4.Social rental.
Indicator score[1][2][3][4]
[a]05575100
[b]0456595
[c]0355590

Source: JRC.

 

Figure 115 shows the indicator thresholds used to link indicator scores with performance classes for I.3.3. While these thresholds and performance classes are not directly applied in the evaluation of KPI and dimension scores and performance classes, they are included here to assist users in determining appropriate performance levels for specific project aspects and to offer clear guidance on their improvement.

Figure 115. I.3.3 indicative performance classes and thresholds.

a

Source: JRC.

Title
5.6.5 Homeownership scheme (I.3.4)
Text

Indicator I.3.4 applies to residential projects that adopt homeownership schemes. Homeownership schemes are initiatives designed to assist households in purchasing and owning homes. These schemes can include a range of financial assistance and policy measures and can be individual or collective.

As widely demonstrated in the literature (e.g. Aalbers, 2019), the financialisation of the housing market and commodification of housing make private homeownership a form of tenure that tends to exacerbate the production of social and spatial inequality.

While de-commodification is a phenomenon that must be addressed at a policy level, at the project scale tenancy should be favoured over homeownership, which has traditionally been the reference tenure in housing policies (Schmid, 2018).

If a project includes, either wholly or partially, private ownership as a form of tenure, the most inclusive form is collective ownership (e.g. cooperatives, community land trusts, co-housing) rather than individual ownership, as the former ensures greater stability and promotes forms of collaboration and mutual support.

The assessment of the indicator should consider the different types of homeownership schemes within a building, neighbourhood or urban scale project. The user may assess the most dominant homeownership scheme. Alternatively, the user may perform multiple assessments corresponding to the distinct homeownership schemes. In the latter case, the indicator score is estimated as a weighted average, with the weights obtained from the relative occurrence of each scheme.

The assessment requires the following information to be identified and collected:

  • Information about the local housing sector in relation to homeownership (at the urban level).
  • The project homeownership scheme.

The indicator is evaluated according to the questions and the score matrix provided in Table 164.

Table 164. I.3.4 score.

Contextual variance: How is the housing sector characterised at the urban level in relation to homeownership? (single selection allowed)
a.Dominant private market homeownership (> 60%).
b.Mix of private market and subsidised homeownership (both < 60%).
c.Dominant subsidised homeownership (> 60%).
Metric: What is the homeownership scheme adopted by the project? (single selection allowed)
1.Individual market homeownership.
2.Collective homeownership.
3.Individual subsidised homeownership.
Indicator score[1][2][3]
[a]03570
[b]03060
[c]02550

Source: JRC.

 

Figure 116 shows the indicator thresholds used to link indicator scores with performance classes for I.3.4. While these thresholds and performance classes are not directly applied in the evaluation of KPI and dimension scores and performance classes, they are included here to assist users in determining appropriate performance levels for specific project aspects and to offer clear guidance on their improvement.

Figure 116. I.3.4 indicative performance classes and thresholds.

a

Source: JRC.

Title
5.6.6 Pedestrian accessibility to essential services and amenities (I.3.5)
Text

Indicator I.3.5 applies only to residential projects.

Pedestrian accessibility is understood as the residents' ability to reach essential services and amenities in their neighbourhood. Proximity to basic services is acknowledged as central to promoting health and reducing inequalities. To basic services, which include healthcare (pharmacies) and education (primary school), essential amenities are added, meaning those facilities that enhance the quality of life and the liveability of a neighbourhood, such as food shopping (groceries and supermarkets) and open public spaces (playgrounds, parks, green areas).

Considering only these essential services, 5 minutes are adopted as the optimal walking access time for pedestrian accessibility.

To assess the project accessibility to essential services and amenities, the following steps can be followed. The steps are based on the Sustainable Development Goals (SDG) Transformation Centre (2023).  However, the adopted steps here are simplified and exclude calculations related to population:

  • Localise essential services and amenities on a georeferenced spatial database (e.g. OpenStreetMap) within an area including the project. The area is practically limited by the identification of the closest services and amenities as explained below.
  • Identify the departure points within the project scale and destination points. Departure points are defined either as the building coordinates for building scale projects, or as the coordinates of all street intersection within the project scale for neighbourhood and urban scale projects. Destinations refer to the coordinates of services and amenities. For each type of service or amenity (Table 165), only the closest one is used in evaluating the average distance in the next step. At least four destinations per departure point should be considered, corresponding to at least one service/amenity type of healthcare, education, food shopping and open public space.

Table 165. Services and amenities considered in assessing pedestrian accessibility.

Essential servicesTypes
HealthcarePharmacy  
EducationPrimary school  
Essential amenitiesTypes
Food shoppingGrocerySupermarket 
Open public spacePlaygroundParkGreen area

Source: JRC.

 

  • Measure the distance from each departure point to the closest essential amenities and services (i.e. the considered destinations per departure point). Calculate the average walking distance per departure point. This is defined as the arithmetic mean of distances from a departure point to the corresponding destinations. For neighbourhood and urban scale projects, calculate the average distance as the arithmetic mean of the mean distances calculated for all departure points.
  • Transform the average distance into walking time assuming an average pedestrian walking speed of 4.8 km/h.

If the project is at the urban scale, it is suggested to divide the project area into sub-areas. For example, by overlaying a 1000-metre grid onto the project area, it is possible to calculate first the average distance within each grid, and then compute an average distance at the urban scale. This allows identifying potential gaps and intervening in the project design to enhance accessibility.

The assessment requires the following information to be identified and collected:

  • Project design plans.
  • Identification and localisation of essential services and amenities within an area including the project (e.g. 1000 metres from the perimeter of the project), with the possibility to expand it if an essential service or amenity cannot be found within this range.

Using the estimated walking time, the indicator is evaluated according to the question and the score provided in Table 166.

Table 166. I.3.5 score.

Metric: What is the level of pedestrian accessibility1 to essential services and amenities? (single selection allowed)
1.Pedestrian accessibility to essential services and amenities is more than 15 minutes.
2.Pedestrian accessibility to essential services and amenities is between 11 and 15 minutes.
3.Pedestrian accessibility to essential services and amenities is between 6 and 10 minutes.
4.Pedestrian accessibility to essential services and amenities is less than 5 minutes.
Indicator score[1][2][3][4]
05070100

1        Pedestrian accessibility evaluated according to Section 5.6.6.

Source: JRC.

 

Figure 117 shows the indicator thresholds used to link indicator scores with performance classes for I.3.5. While these thresholds and performance classes are not directly applied in the evaluation of KPI and dimension scores and performance classes, they are included here to assist users in determining appropriate performance levels for specific project aspects and to offer clear guidance on their improvement.

Figure 117. I.3.5 indicative performance classes and thresholds.

a

Source: JRC.

Title
5.6.7 Accessibility to services and amenities by public transport (I.3.6)
Text

Indicator I.3.6 applies only to residential projects.

The essential services and amenities identified for indicator I.3.5 must be reachable on foot to ensure optimal accessibility and that basic needs are satisfied. Ensuring fair access through public transportation to services and amenities is equally important from a spatial justice perspective (Tahmasbi and Haghshenas, 2019). Indicator I.3.6 measures the travel time from the project to destinations that offer such opportunities according to Table 167.

Table 167. Services and amenities considered in assessing accessibility by public transport.

ServicesTypes
HealthcareHospitalHealth facility
EducationSecondary school 
AmenitiesTypes
ShoppingRetail areaCentral district
LeisureParkSport hall

Source: JRC.

 

To assess the accessibility of projects to services and amenities by public transport, the NEB method adopts the following steps:

  • Localise services and amenities on a georeferenced spatial database (e.g. OpenStreetMap) within an area including the project. The area is practically limited by the identification of the closest services and amenities as explained below.
  • Identify the departure points within the project scale and destination points. Departure points are defined either as the building coordinates for building scale projects, or as the coordinates of all street intersection within the project scale for neighbourhood and urban scale projects. Destinations refer to the coordinates of services and amenities. For each type of service or amenity (Table 167), only the closest one is used in evaluating the average travel time by public transport in the next step. At least four destinations per departure point should be considered, corresponding to at least one service/amenity type of healthcare, education, shopping and leisure.
  • By using local public transit applications (or similar software), calculate the travel time from each departure point to the closest services and amenities (i.e. the considered destinations per departure point). Calculate the average travel time per departure point. This is defined as the arithmetic mean of travel times from a departure point to the corresponding destinations. For neighbourhood and urban scale projects, calculate the average travel time as the arithmetic mean of the mean travel times calculated for all departure points.

If the project is at the urban scale, it is suggested to divide the project area into sub-areas. For example, by overlaying a 1000-metre grid onto the project area, it is possible to calculate the travel time first within each grid, and then compute an average travel time at the urban scale. This allows identifying potential gaps and intervening in the project design to enhance accessibility to services and amenities by public transport.

The assessment requires the following information to be identified and collected:

  • Project design plans.
  • Identification and localisation of public transport stops on a georeferenced spatial database.
  • Identification and localisation of the closest services and amenities from Table 167 on a georeferenced spatial database, within an area including the project.

Using the estimated average travel time, the indicator is evaluated according to the question and the score provided in Table 168.

Table 168. I.3.6 score.

Metric: What is the level of accessibility by public transport1 to services and amenities? (single selection allowed)
1.The average travel time by public transport is ≥ 30 minutes.
2.The average travel time by public transport is ≥ 22.5 and < 30 minutes.
3.The average travel time by public transport is ≥ 15 and < 22.5 minutes.
4.The average travel time by public transport is < 15 minutes.
Indicator score[1][2][3][4]
05070100

1        Accessibility by public transport evaluated according to Section 5.6.7.

Source: JRC.

 

Figure 118 shows the indicator thresholds used to link indicator scores with performance classes for I.3.6. While these thresholds and performance classes are not directly applied in the evaluation of KPI and dimension scores and performance classes, they are included here to assist users in determining appropriate performance levels for specific project aspects and to offer clear guidance on their improvement.

Figure 118. I.3.6 indicative performance classes and thresholds.

a

Source: JRC.

 

Title
5.6.8 Pedestrian accessibility to public transport (I.3.7)
Text

This indicator evaluates the level of pedestrian accessibility provided by the project to public transport stops, regardless of the transport mode (bus, metro, tram, train). It is measured as the average distance to the nearest public transport stops, assuming that people are willing to walk 500 metres to reach a transport stop (Poelman et al., 2020).

The proximity to public transport not only encourages the use of greener modes of transport, but also promotes social inclusion through better accessibility to job opportunities, education, and healthcare.

To assess the accessibility of projects to public transport, the following steps can be followed. The steps are based on the SDG Transformation Centre (2023).  However, the adopted steps here are simplified and exclude calculations related to population: 

  • Localise public transport stops on a georeferenced spatial database (e.g. OpenStreetMap) within an area including the project. The area is practically limited by the identification of the closest public transport stops.
  • Identify the departure points within the project scale and destination points. Departure points are defined either as the building coordinates for building scale projects, or as the coordinates of all street intersection within the project scale for neighbourhood and urban scale projects. Destinations refer to the coordinates of the closest public transport stops to the departure points (i.e. one stop per departure point).
  • Measure the distance from each departure point to the closest public transport stop (i.e. the considered destination per departure point). For neighbourhood and urban scale projects, calculate the average distance as the arithmetic mean of distances calculated for all departure points.

If the project is at the urban scale, it is suggested to divide the project area into sub-areas. For example, by overlaying a 1000-metre grid onto the project area, it is possible to first calculate the average distance within each grid, and then compute an average distance at the urban scale. This allows identifying potential gaps and intervening in the project design to enhance accessibility to public transport.

The assessment requires the following information to be identified and collected:

  • Project design plans.
  • Identification and localisation of public transport stops on a georeferenced spatial database, within an area including the project (e.g. 1000 metres from the perimeter of the project).

Using the average distance to public transportation stops, the indicator is evaluated according to the question and the score provided in Table 169.

Table 169. I.3.7 score.

Metric: What is the level of pedestrian accessibility1 to public transport? (single selection allowed)
1.The average distance to public transport stops is more than 800 m.
2.The average distance to public transport stops is between 500 and 800 m.
3.The average distance to transport stops is between 300 and 500 m.
4.The average distance to transport stops is less than 300 m.
Indicator score[1][2][3][4]
05070100

1        Pedestrian accessibility to public transport evaluated according to Section 5.6.8.

Source: JRC.

 

Figure 119 shows the indicator thresholds used to link indicator scores with performance classes for I.3.7. While these thresholds and performance classes are not directly applied in the evaluation of KPI and dimension scores and performance classes, they are included here to assist users in determining appropriate performance levels for specific project aspects and to offer clear guidance on their improvement.

Figure 119. I.3.7 indicative performance classes and thresholds.

a

Source: JRC.

Title
5.6.9 Example (I.3)
Text

In a context with a large share of subsidised and social rental (i.e. 25%), and a housing sector with dominant private market homeownership (compared to the subsidised one), a project involves the construction of a new neighbourhood comprising five buildings, of which four are residential buildings and one is for office use. On the ground floor of two buildings, there will be local commercial spaces (including a grocery store and a pharmacy). Out of the four residential buildings, one is designated for sale on the market for homeownership, while three are intended for rental. Since the neighbourhood scale project includes mixed use, the user will need to classify the project based on the most dominant aspect and assess only this one at the scale of the complete project. Alternatively, the user may opt to assess the project as two individual projects, one addressing residential use, and one addressing non-residential use, both assessed at the scale of the complete project as follows:

Project classification – a: Neighbourhood – Newbuild – Residential

Project classification – b: Neighbourhood – Newbuild – Non-residential

The second approach is followed in the following.

Available dwelling space for households (I.3.1): For the residential use, the project respects the minimum standards for the required space and associates the incoming residents to the apartment typology based on the household composition. Considering a [2] response in Table 161, the indicator achieves a score of I.3.1a = 70. This indicator does not apply to the non-residential use.

Maintaining the quality of spaces and services (I.3.2): For the residential use, there is a management plan developed by the housing provider with budget allocation, but it is partial and only includes cleaning and maintenance of common areas. Considering a [2] response in Table 162, the indicator achieves for the residential component a score of I.3.2a = 50. To improve this score, the provider should collaborate with future residents to design a collective management plan that includes all aspects considered important for the quality of life at the building and neighbourhood level. This plan should also allocate the corresponding budget. For the non-residential use (office building and commercial spaces), there is an overall strategy for maintenance, which includes a budget. Considering a [4] response in Table 162, the indicator achieves a score of I.3.2b = 100.

Rental scheme (I.3.3): Three residential buildings out of the four are intended for rent and one for homeownership. Two thirds of the housing units in the three rental buildings are intended for social rent and one third for rent at market price. Considering [c-1 and c-4] responses in Table 163, the indicator achieves a score of I.3.3a = (1/3) · 0 + (2/3) · 90 = 60. The indicator does not apply to the office building and the residential building that is intended for homeownership.

Homeownership scheme (I.3.4): The residential building intended for homeownership will provide individual ownership. Considering an [a-1] response in Table 164, the indicator achieves a score of I.3.4a = 0. The indicator does not apply to the office building and the three residential buildings that are intended for rental (assessed by I.3.3).

Pedestrian accessibility to essential services and amenities (I.3.5): The new neighbourhood is close to essential services and amenities, and it includes three street intersections which define the departure points. For each departure point the average distance is first calculated from four types of services and amenities at the closest distance according to Table 170. Subsequently, the average distance of the neighbourhood to services and amenities is calculated as the average of the departure point distances. The average distance is transformed to walking time according to Equation (230). Considering a [4] response in Table 166, the indicator achieves a score of I.3.5a = 100. The indicator does not apply to non-residential use.

 

Table 170. Assessment of pedestrian accessibility to essential services and amenities.

Departure pointsClosest distance from following destinations (m):
PharmacyPrimary schoolGrocery Green areaAverage
Street intersection 18045080450265
Street intersection 2200300200300250
Street intersection 3180400180400290
Average distance from all intersections (m)268.3

Source: JRC.

a

(230)

Accessibility to services and amenities by public transport (I.3.6): At least one type per service and amenity must be considered from Table 167. In this example the services and amenities of Table 171 are considered. The average travel time for street intersections 1 and 2 is the same, since the same bus and tram stops service them to the same hospital, primary school, retail area and sport hall. Considering a [3] response in Table 168, the indicator achieves a score of I.3.6a = 70. The indicator does not apply to non-residential use.

Table 171. Assessment of accessibility to services and amenities by public transport.

Departure pointsClosest travel time from following destinations (minutes):
Hospital (by bus)Secondary school (by bus)Retail area (by tram)Sport hall (by bus)Average
Street intersection 12516221018.25
Street intersection 22516221018.25
Street intersection 32920261422.25
Average travel time from all intersections (minutes)19.58

Source: JRC.

 

Pedestrian accessibility to public transport (I.3.7): There are two public transport stops (A, B) close to the neighbourhood. Each stop serves both bus and tram lines. Stop A is closer to street intersections 1 and 2, whereas stop B is closer to street intersection 3, according to Table 172. Considering a [4] response in Table 169 based on the average distance among the three intersections, the indicator achieves a score of I.3.7a, b = 100.

Table 172. Assessment of pedestrian accessibility to public transport.

Departure pointsClosest distance from following destinations (m):
Bus and tram stop ABus and tram stop B
Street intersection 1150—
Street intersection 2175—
Street intersection 3—450
Average distance from all intersections (m)258

Source: JRC.

 

The key performance indicator I.3 is calculated as follows for the residential and non-residential aspects of the project:

a

(231)

a

(232)

The scores correspond to Good and Excellent performance classes for residential and non-residential use, respectively, with performance class scores of PCSI.3a = 75 and PCSI.3b = 100.